An Elevator Rigged up at the Student Union building
An Elevator Rigged up at the Student Union building
  • Reporter Gwak Jun-ho
  • 승인 2016.12.07 11:08
  • 댓글 0
이 기사를 공유합니다

A new 15-person occupancy elevator is under installation at the Student Union. The construction, scheduled to be completed by February 20, 2017, also includes tearing down and replacing worn out floors and installing aluminum panels. Some degree of noise is expected during the demolition process. In order to minimize inconvenience, the work will be conducted on weekends.